Northumbria University
Block
  Northumbria University Ellison Courtyard      

This project was carried out for University Estates Dept. LMS installed granite edging and kerbing, a new block paved walkway leading to the main campus, street lighting, stainless steel street furniture, planting and turfing
Client: Northumbria University
Landscape architect: SLR Consulting



  North Seaton Business Park
Block
  North Seaton Business Park      

This project involved the planting of 30 hectares of structure trees and shrubs plus protective fencing and seeding to this proposed business park.
Client: One NorthEast
Landscape architect: Glen Kemp Ltd



  Newcastle upon Tyne University
Block
  Newcastle upon Tyne University      

LMS carried out improvement works to an existing thoroughfare for the University Estates Dept. We installed granite kerbing, stainless steel street furniture, constructed a new car park, installed new street lighting and resurfaced the existing walkway
Client: Newcastle upon Tyne University
Landscape architect: E2 Landscape Architecture




  St Anthony's Estate, Walker
Block
  St Anthony's Estate, Walker      

LMS carried out environmental improvement works to several hundred properties throughout this estate for Your Homes Newcastle. The works consisted of new brickwork, metal railings, paved driveways and footpaths.
Client: Your Homes Newcastle
Landscape architect: Newcastle City Council Design Group



  Sage Music Centre:Gateshead
Sage Music Centre:Gateshead
  sage music centre      

Work consisted of clearing gabion retaining structures and planting ground cover ivies. Maintained site for 12 months.
Client: Gateshead Council
Landscape architect: Insite Environments.



  Wansbeck District Council: Hirst Park, Ashington
Block
  hirst park  
Hirst Park
 
Block

Client Wansbeck District Council. Landscape architect Glen Kemp Ltd. Refurbishment of an existing park. Constructed access road and car park for playing field users. Block paving and bollards were used to construct an entrance to the park. Play equipment was installed to form a new play area. Bow top metal fencing and railings erected to secure the playing fields.